Written by James Ford, education writer · Reviewed by Farah Hussain, qualified teacher

Published 23 August 2026 · Last updated 19 September 2026

How to pass the 11 plus, and how to prepare for it, means building four skill areas: English comprehension, verbal reasoning, mathematics and non-verbal reasoning. Many families begin in Year 3 and build gently from there, in short daily sessions rather than long weekend ones, adding timed sections and full papers only in the closing months before the test.

Start with a plan Pathway Eleven builds the routine for you Create a free account → Free account. Free Starting Assessment. Unlock the full plan when you are ready.
On this page What it tests The timeline Year 5 How much practice Timing and mocks Costly mistakes Where we fit

What this guide covers

  1. What the test actually covers
  2. Is the 11 plus the right choice for your child?
  3. How places are actually offered
  4. Registration and the admissions timetable
  5. Appeals, and why they are not a plan
  6. The shape of the preparation years
  7. Year 3: reading, number, no papers
  8. Year 4: meeting the formats
  9. Year 5: the decisive year
  10. The summer before Year 6
  11. The final weeks
  12. How much practice is enough?
  13. What the research actually supports
  14. English comprehension strategy
  15. Verbal reasoning strategy
  16. Mathematics strategy
  17. Non-verbal reasoning strategy
  18. Vocabulary, the ceiling nobody sees
  19. Timing, and what mocks are for
  20. Marking that teaches something
  21. The mistakes that cost the most
  22. Tutor, programme, or do it yourself?
  23. Why the advice changes by area
  24. Wellbeing, and knowing when to stop
  25. What the parent's job actually is
  26. What progress looks like month to month
  27. Where Pathway Eleven fits
  28. Common questions
  29. Sources

What does the 11 plus actually test?

The 11 plus is not a harder version of the work your child does at school. It samples four areas, and only two of them appear on a primary timetable under anything like the same name.

It is written both ways, and this guide uses them interchangeably: the eleven plus and the 11 plus are one examination.

  • 1English comprehensionReading an unseen passage and answering questions about it. The passage is usually older in style and longer than a ten-year-old expects, and the questions reward going back into the text rather than remembering it. A surprising share of the marks turn on vocabulary in the questions themselves, not in the passage.
  • 2Verbal reasoningWord puzzles: codes, letter sequences, analogies, hidden words, odd ones out. Each type has a method that takes a few minutes to learn. The difficulty is that there are a lot of types, and every one of them collapses the moment a child meets a word they do not know.
  • 3MathematicsFamiliar primary content asked faster and in more steps. Most of the arithmetic is work your child has already covered. What the test adds is the job of working out which operation is wanted, often twice in the same question, under a clock.
  • 4Non-verbal and spatial reasoningShape and pattern work: rotations, reflections, sequences, matrices, nets and cubes. There is no reading and no arithmetic. There is only the ability to notice what changes from one figure to the next.

Two things are worth knowing before you plan around that list. Not every test uses all four areas, and where all four appear they are rarely weighted equally, so a child's weakest area is not automatically the one to pour time into. And the mechanics of the paper matter as much as the content: a child who has only ever written answers in a book can lose marks on a separate answer sheet purely by drifting a row out of alignment. That is not a knowledge gap. It is a rehearsal gap, and it is cheap to close.

Is the 11 plus the right choice for your child?

This is the question most guides skip, and it deserves an honest paragraph before any of the planning.

Selection at eleven is not a verdict on a child. It is a sorting mechanism with a fixed number of places.

From "Is the 11 plus the right choice for your child?"

Selection at eleven is not a verdict on a child. It is a sorting mechanism with a fixed number of places, and the number of places is decided by buildings and budgets rather than by how many capable children turned up that year. A child can be well taught, hard-working and genuinely bright and still not be offered a place. If your family cannot say that sentence out loud without flinching, the two years ahead will be harder than they need to be.

The practical questions are smaller than they sound. Can your child sit and work on something for twenty minutes without a running negotiation? Do they recover reasonably quickly from getting something wrong, or does a mistake end the session? Do they read for pleasure, at all, ever? None of these is a pass or fail. Together they tell you how much of the next two years will be spent on the work and how much on getting to the work.

Here is the thing few parents are told: the strongest predictor of a miserable preparation year is not a child's starting ability. It is a family with no second option they are happy to name. Find the school you would be content with if the test goes the other way, say it in front of your child, and mean it. Everything afterwards gets easier, including the practice, because the stakes have been moved back down to a size a ten-year-old can carry.

How are grammar school places actually offered?

Passing a test and being offered a place are two different events, and conflating them is the source of a great deal of avoidable distress in March.

Admission arrangements in England are not left to each school's preference. They are governed by statutory guidance: the Department for Education's School Admissions Code is described as guidance that schools must follow when carrying out their duties relating to admissions, and the current code has applied since 1 September 2021. That is why every school has to publish its arrangements rather than simply decide.

What those arrangements contain differs school by school. GOV.UK's summary of how places are offered lists the criteria schools commonly use, and passing an entrance exam, for selective schools such as grammar schools, sits in that list as one criterion among several. Distance, siblings, looked-after children and other published criteria sit alongside it.

Read that carefully, because the planning consequence is real. In a selective area the test usually decides who is eligible, and a separate published criterion decides who among the eligible children is offered a place. Two schools whose qualifying standards look similar can behave completely differently once the offers go out, because their tie-breakers differ. Before you settle a preference order, read the actual admission arrangements for the specific schools on your list, on those schools' own pages, for the year your child will enter. Nothing on a tutoring forum is a substitute for that document, and nothing on this page is either.

When do you have to register, and who decides?

The single most expensive mistake in 11 plus preparation has nothing to do with practice. It is missing the registration window, and it happens every year to families whose children were entirely ready.

Registration is separate from the ordinary secondary school application. In most selective areas a parent has to actively register the child for the test, months before the common application form is even open, and the registration window frequently closes before the summer holiday of Year 5. If nobody registers the child, there is no test to sit and no route back in, however well the preparation went.

We are not going to print a date here, and you should treat any site that does with suspicion unless it is the admissions authority's own. Deadlines, forms and eligibility rules are set locally, by the local authority, the school or the partnership of schools running the test, and they move. The School Admissions Code requires arrangements to be published; it does not make them the same everywhere. Your job is to find the published version for your own authority and the schools you care about.

Three practical habits, all of them cheap. In the spring term of Year 5, find the official registration page for every school on your list and put its opening and closing dates in a calendar with an alert a fortnight early. Check whether a separate supplementary form is required, because in some areas it is and the test registration alone is not enough. And register on the first day of the window rather than the last: the pages that carry these forms are not built for the traffic they get on a deadline evening.

Rather not build the study timetable yourself while you deal with all this? Create a free account and the daily plan is set for you.

What happens if the answer is no?

Appeals exist, they are properly constituted, and they are not a plan.

The process is governed by its own statutory guidance. The Department for Education's School Admission Appeals Code sets out how schools should organise and run admission appeals, and a new code came into force on 1 October 2022, applying to appeals lodged on or after that date. Panels are independent, the process is prescribed, and a family that wants to appeal has a real right to be heard.

What the numbers say about the outcome is worth knowing before you build any hope on it. In its Admission appeals in England release published in August 2026, covering the 2025/26 academic year, the Department for Education recorded that 3.6% of secondary admissions went to an appeal heard by a panel, down from 3.9%, which the release counts as 27,100 appeals heard. Of those, 19.5% succeeded, down from 19.9%, or roughly 5,300. Primary appeals are rarer still, at 1.0% of admissions, and succeed less often, at 15.0%.

Read those two figures together. Appealing is uncommon, and roughly four in five appeals that are heard do not change the outcome. That is not an argument against appealing if you have real grounds. It is an argument for putting the family's effort where it can still move something, which is the test itself and the preference list, months before any of this arises. A carefully chosen second and third preference does more for your child than an appeal is statistically likely to.

The shape of the preparation years

In most selective areas the test sits at the very start of Year 6, which means the last uninterrupted block of preparation time is the summer holiday before it, and the decisive teaching year is Year 5. Everything below is built backwards from that.

The table is a ladder, not a schedule to catch up on. A family joining in Year 5 does not need to retrofit Year 3 and Year 4; they need to accept that the same ground is being covered in less time and plan the week accordingly.

What each stage is for, and what it deliberately leaves out
StageWhat it is forWhat is deliberately not happening yet
Year 3 Reading above the comfortable level, number facts, and curiosity about words. No papers, no timing, no mention of the test to the child.
Year 4 Meeting each reasoning format once, gently, so nothing is a surprise later. No full sections, no scores kept, no comparison with other children.
Year 5, autumn Establishing the routine and covering content properly. No clock. Accuracy first, speed later.
Year 5, spring Closing the content gaps the autumn exposed, and the first timed sections. No full papers yet, and no weekly score chart.
Year 5, summer Registration admin, and turning knowledge into exam behaviour. No new topics started in the last fortnight of term.
Summer holiday Full papers, spaced out, with real time to act on each one. No six-week stop, and no six-week grind either.
Year 6, final weeks Sharpening familiar work, protecting sleep, rehearsing the mechanics. No new content, and no last-minute change of method.

Year 3: reading, number, and no papers at all

Year 3 is the easiest place to start and the easiest place to ruin. A seven-year-old given practice papers learns that reading is a test, and that lesson takes years to unlearn.

What genuinely belongs here is short and unglamorous. Reading slightly above the comfortable level, out loud, with someone who stops to ask what a word means. Number facts until they arrive without effort, because every later maths question is easier when the arithmetic is free. Jigsaws, tangrams, drawing symmetrical patterns and anything else that involves turning shapes in the head. Talking about words: where they come from, what the prefix does, why two words that look alike do not mean the same thing.

The word we would use for the whole year is exposure, not preparation. Our fuller notes on this are on the Year 3 page, and the honest summary is that most of the useful work in Year 3 does not look like schoolwork.

A realistic Year 3 week
DayWhat actually happensHow long
MondayReading together, alternating paragraphs, stopping on any word neither of you can define.15 minutes
TuesdayNothing. Club, park, television. This is not a rest day earned by good behaviour, it is part of the plan.None
WednesdayTimes tables out loud in the car, mixed up rather than in order.5 minutes
ThursdayReading, same as Monday. A different kind of book from the one school sent home.15 minutes
FridayNothing.None
SaturdayA shape or logic puzzle done side by side, treated as a game because it is one.15 minutes
SundayReading, or a chapter read to your child if they are tired. Being read to still counts at this age.15 minutes

That is a little over an hour a week. It is enough, and a family that keeps it going for three years arrives at Year 5 with an advantage that cannot be bought later in the summer.

Year 4: meeting the formats before they matter

Year 4 has one job that Year 3 does not: introducing the two reasoning strands so that they are familiar rather than alarming when the real work starts.

The reason to do it now is specific. Verbal and non-verbal reasoning both have a large first-encounter cost. A child meeting a letter-code question for the first time is not being tested on reasoning, they are being tested on whether they have seen a letter-code question. Paying that cost across a relaxed year, a format at a time, removes a whole layer of panic from Year 5. It is also the year to notice, without saying anything, whether a child finds shape work easy and word work slow, or the reverse, because that shapes how you divide the time later.

What still does not belong: scores, comparisons, full sections, or any sentence that begins "if you want to get into". Our Year 4 guide goes further into where the line sits. If your child is in Year 3 or Year 4 and you are wondering whether you have left it too late, you have not, by a wide margin.

A realistic Year 4 week
DayWhat actually happensHow long
MondayReading, still out loud some of the time. Two or three new words written on the fridge.15 minutes
TuesdayOne verbal reasoning format, taught first and then tried. Not a mixed set: one type, met properly.15 minutes
WednesdayMental arithmetic, aiming at instant recall rather than correct-eventually.10 minutes
ThursdayOne non-verbal format, same approach. Explain the rule aloud before choosing an answer.15 minutes
FridayNothing, deliberately, every week.None
SaturdayA longer read, alone, of something your child chose. Talk about it at lunch rather than testing it.30 minutes
SundayMaths word problems, two or three, discussed rather than marked.15 minutes

A little over an hour and a half a week, spread thinly. Notice what a Tuesday looks like: a single question type, taught before it is practised, and finished while your child still has attention left over.

Year 5: the year that decides most of it

If a family has one year to do this properly, this is the year. The test is at the start of Year 6, so Year 5 is the last full year of teaching time, and the summer that follows it is a top-up rather than a rescue.

The autumn term is for coverage and routine. Every question type met, every maths topic touched, the session at the same time on the same days so that it stops being a nightly decision. No clock yet: a child who is rushed before they are accurate simply gets faster at being wrong, and unpicking that in the spring costs more time than the rushing ever saved.

The spring term is for the gaps the autumn exposed, and for the first timed sections. Time a section, not a paper. The skill being learned is pacing inside a block of questions, and that is trainable in fifteen minutes at a time. The summer term is for registration admin, more timed work, and the first full paper sat properly, at a table, with a real answer sheet. Our Year 5 guide has the term-by-term version.

A realistic Year 5 week, spring term
DayWhat actually happensHow long
MondayMaths: one topic, taught if it is new, then practised untimed. Mistakes talked through the same evening.25 minutes
TuesdayEnglish: a short comprehension, untimed, with the answers checked against the passage rather than against memory.25 minutes
WednesdayMixed verbal reasoning, deliberately mixed so that identifying the type is part of the work.20 minutes
ThursdayNon-verbal reasoning, plus five minutes of arithmetic recall as a warm-up.25 minutes
FridayNothing. Still nothing. This is the day that keeps the other six.None
SaturdayOne timed section, then twenty minutes going through it together. The review is the point, not the score.40 minutes
SundayReading, and a look at the week's wrong answers to see whether any of them repeat.25 minutes

Around three hours across a week, and the largest single block is forty minutes. If your Year 5 week looks like two long sessions at the weekend instead, the same total is doing considerably less work than this one, for reasons the research section below makes concrete.

app.pathwayeleven.co.uk
Pathway Eleven student home showing a Year 5 pupil’s daily 11 plus revision plan, with today’s revision set marked complete, an exam countdown and a year-long grid of completed revision days.
One clear plan a day: the student screen shows what is due, whether it is finished, and how the weeks have added up.

The summer before Year 6

Six weeks with no school is the last block of uninterrupted time before the test, and it is where families make their two biggest errors in opposite directions.

The first is stopping completely. Reasoning skills are not knowledge; they fade with disuse faster than facts do, and a child who does nothing for six weeks spends the first fortnight of September recovering ground rather than gaining any. The second is treating the holiday as a training camp. Three hours a day in August produces a child who is thoroughly sick of the whole thing by the week that matters, and burnout in the last fortnight is not recoverable.

What works is a smaller version of the term routine, running on most days, with whole days and ideally a whole week genuinely off. Thirty to forty minutes on a working day is plenty. The one thing the holiday makes possible that term time does not is the full paper sat properly, so put two or three across the six weeks, spaced far enough apart that there is time to act on each. A paper sat on Monday and another on Wednesday measures a child twice and teaches them nothing.

Use the holiday for the slow things as well. Vocabulary built through a long book is worth more than a list. And if there is one topic that has been quietly avoided all year, this is the moment to teach it properly, because there will be no room for it in September.

The final weeks, and the morning itself

The last two or three weeks have one purpose: making familiar work feel automatic. Almost everything that goes wrong at this stage comes from trying to do something else.

Reduce the volume and keep the routine. A child who has been working five days a week should still be working five days a week, for less time. New content introduced now displaces something already secure, and the trade is almost always bad. If a topic is genuinely missing, teach it once, plainly, and then leave it alone rather than drilling it into the last week.

Rehearse the mechanics, not just the questions. Practise transferring answers to a separate sheet if that is what the test uses. Agree in advance what your child does when a question defeats them, so the decision is already made when their heart is going. A simple rule works: read it twice, make the best guess available, mark it, move on. Children lose more marks to a single question that ate four minutes than to any topic they never learned.

In the final week, sleep does more than practice. Move bedtime earlier rather than later, eat breakfast on the morning, and say nothing about the outcome in the car. Your child cannot revise on the way and can absolutely absorb your face. The last useful thing a parent can say is that you will be pleased with them either way, and it is worth saying it a few days early, when there is time for it to land.

How much practice is enough?

Twenty to thirty minutes on a school day is enough for most children in Year 5, and ten to fifteen is enough lower down the school. That is a genuinely short session, and it is short on purpose.

Worth knowing Five contacts of twenty minutes do more than one contact of a hundred minutes

The important number is not the length but the number of separate occasions, even though the total is identical.

The important number is not the length but the number of separate occasions. Reasoning improves through repeated contact with the same question types over time, so five contacts of twenty minutes do more than one contact of a hundred minutes, even though the total is identical. The short session also survives contact with real life: it is the one a tired child will still agree to on a wet Wednesday in February, and February is where plans die.

Two things matter more than the duration. The first is whether the work is at the right level. Practice that is far too easy builds a pleasant feeling and nothing else, and practice that is far too hard teaches a child that effort does not pay, which is the single most expensive belief they can acquire. The second is whether the mistakes are examined. An hour of unmarked practice is an hour of rehearsing whatever a child already does, errors included.

A simple test of whether the volume is right: at the end of a fortnight, can your child explain how they got an answer they previously got wrong? If yes, the volume is doing its job. If they can only tell you the answer, there is too much practice and too little teaching in the mix.

What does the research actually support?

Most advice about revision is folklore. There is, however, a serious body of work on which study techniques earn their time, and it is unusually relevant to a test sat by a ten-year-old with limited attention.

The best-known review is Dunlosky, Rawson, Marsh, Nathan and Willingham's Improving Students' Learning With Effective Learning Techniques, published in Psychological Science in the Public Interest in 2013. The authors rated ten common techniques and concluded, in their words, that "practice testing and distributed practice received high utility assessments because they benefit learners of different ages and abilities and have been shown to boost students' performance across many criterion tasks".

Two things follow directly. Distributed practice means spreading the same total time across more occasions, which is the whole argument for a short daily session over a long weekend one. Practice testing means retrieving an answer rather than reviewing one: attempting the question, then checking, rather than reading a worked example and feeling that it made sense.

The same review rated the techniques most families default to, including rereading and highlighting, considerably lower. That is worth sitting with, because rereading a topic your child got wrong feels productive and is close to the least efficient thing available. Turning it around costs nothing. Instead of going back over the page on codes, ask your child to do two code questions cold, three days after they last saw one. If they can, it is learned. If they cannot, you have found something to teach, which is more than rereading would have told you.

English comprehension: the slow subject

Comprehension is the area that improves most slowly and keeps improving longest, which makes it the worst candidate for a late push and the best candidate for early attention.

It rests on three separate things: reading stamina, vocabulary, and the willingness to go back into the passage to check rather than answering from impression. The third is the one that is trainable in weeks rather than years, and it is where the quickest marks live. A child who underlines the line their answer came from is a child who stops losing marks to nearly-right recall.

The daily habit that helps most is not a comprehension exercise. It is reading something slightly harder than is comfortable and talking about it, because that is what builds the stamina and the vocabulary at the same time. Exercises then teach the technique: how to tell a retrieval question from an inference question, how to spot when a question is really asking about the author's choice of word, and how much of the answer to write when writing is required.

One habit to break early is answering in the order the questions appear when the passage does not support it. Questions about the closing lines are often quicker than questions about tone, and a child who works strictly top to bottom can run out of time with the easy marks unclaimed. Our guide to 11 plus English comprehension goes through the question types and the technique for each.

Verbal reasoning: many formats, one real obstacle

Verbal reasoning looks intimidating and is largely mechanical. Each type has a method, the methods are learnable in minutes, and a child who has met every type once is most of the way there.

The catch is the volume of types and the fact that published lists of them disagree with one another. Families buy a book organised around one naming scheme, work through it diligently, and meet a differently-labelled version of the same puzzle on the day. The defence is to learn what each puzzle is doing rather than what it is called: this one moves letters by a fixed step, that one asks which word can be made from parts of two others.

The real obstacle is vocabulary, and it does not announce itself. A child who knows the method for synonyms and antonyms perfectly still cannot answer a question containing four words they have never met. This is why verbal reasoning practice sometimes plateaus for months while nothing appears to be wrong with the technique.

Practise in small mixed sets rather than long blocks of one type. Identifying which puzzle you are looking at is part of the skill, and a page of twenty of the same thing removes exactly that part. Our verbal reasoning guide sets out every format with the method for each.

Mathematics: the content is not the problem

Almost all the mathematical content in an 11 plus paper is primary curriculum content your child will meet at school anyway. What the test adds is pace and the number of steps between the question and the answer, and those are separate things to train.

Pace comes from fluency in number facts. A child who has to work out seven eights is spending working memory on arithmetic rather than on the problem, and running out of it. Quick recall practice is dull and pays for itself faster than anything else in the subject. Multi-step word problems deserve their own slot, because the difficulty there is choosing the operation, not performing it, and that is a reading skill wearing a mathematical hat.

Fractions, decimals, percentages and ratio should be taught as one connected idea rather than four separate topics, because the test moves between them inside a single question and a child who has learned them as four unrelated procedures freezes when asked to convert mid-problem.

The other place marks disappear is unit and format errors: an answer in centimetres when the question asked for metres, or a remainder left in when the question wanted a decimal. These are not maths failures and they respond to a habit, which is rereading the question after solving it. Our 11 plus maths topics checklist lists what has to be secure before the test.

Non-verbal reasoning: fast gains, then a ceiling

Non-verbal reasoning has an unusual shape as a subject. Children typically improve quickly once they have seen enough of the puzzles, then flatten out, and further practice buys very little.

That shape should drive the planning. It makes non-verbal reasoning an efficient thing to work on early, in Year 4 and the first half of Year 5, and a poor thing to spend the last month on. Yet the last month is exactly when many families reach for it, because it looks strange and therefore feels urgent, while reading feels like something that is already happening. It is the wrong instinct, and it usually costs marks in areas that were still moving.

The teachable part is the search strategy. A child who scans a matrix asking one question at a time, does the shading change, does the count change, does anything rotate, gets to the rule faster than a child staring at the whole figure hoping it will resolve. Saying the rule out loud before choosing an answer is worth more than any amount of extra volume.

Watch for the specific weakness of paper practice here: rotations and reflections are much easier to judge with a physical object in the hand. If your child is guessing on cube nets, build one out of card before doing another page of them. Our non-verbal reasoning guide covers the question types.

Vocabulary, the ceiling nobody sees

Vocabulary deserves its own section because it is invisible in the results. It never appears as a topic on a report, and it silently caps performance in two of the four areas at once.

A child can have flawless comprehension technique and still lose marks because the question used a word they did not know. The same child can have every verbal reasoning method at their fingertips and be unable to use them. When a plateau appears across both English and verbal reasoning while the maths keeps improving, vocabulary is the first thing to suspect, and it is almost never the thing a family checks.

Word lists are the obvious response and the weak one. Words learned from a list are recognised in the shape of the list and often not in a sentence. Reading builds vocabulary far better because it supplies the context, the repetition and the grammar all at once, which is why the reading habit set up in Year 3 keeps paying out five years later.

What does help alongside reading is talking about word parts. A child who knows that "bene" tends to mean good and "mal" tends to mean bad has a working guess at a dozen words they have never met, and a working guess is exactly what a multiple-choice question rewards. Fifteen minutes a week on prefixes, roots and suffixes goes further than an hour on a list, and it is one of the few things in this guide that is genuinely pleasant to do together.

When should the clock appear, and what are mocks for?

Timing is added after accuracy, never before it, and this is the sequencing error we see most often. A child who is rushed while still making method errors gets faster at making them, and the habit is much harder to remove than it was to create.

The order that works: teach the method, practise it untimed until it is reliable, then time a section, then time a paper. Introduce the clock at the level of a section rather than a whole paper, because pacing inside a block of questions is the actual skill, and a fifteen-minute section trains it without costing a Saturday morning.

Mock tests do a different job. A mock is not a measurement of how a child will do; it is a rehearsal of the conditions, and its value is in the pattern it exposes rather than the number on the front. Look at where the answers stopped, whether accuracy fell away in the final quarter, which question types were skipped and never returned to, and whether the answer sheet matches the working. Any one of those tells you something you can change this week. The overall percentage tells you almost nothing.

Space them out, as the summer section above sets out. Mocks packed into the last fortnight leave no room to act on anything they show, which is the worst possible use of a genuinely useful tool. Our guide to 11 plus mock tests covers how to read a result without panic.

Marking that teaches something

Marking is where most home preparation quietly fails, not because families do not mark, but because they mark for score rather than for cause.

Worth knowing Keep a short record of causes rather than scores

Three columns are enough: the date, the question type, and the reason in four or five words. After a month the repeats are your syllabus.

A tick and a cross tell you that a question was wrong. They do not tell you why, and the why is the only part that can be fixed. There are usually four different reasons behind a cross, and they need four different responses: the method was never learned, the method was learned but misapplied, the arithmetic slipped, or the question was misread. Teaching the topic again when the real cause was a misread question wastes an evening and convinces a child they are bad at something they can do.

The cheapest diagnostic tool available is the question "how did you get that?", asked about a wrong answer without any hint that it is wrong. Children explain their method honestly when they do not yet know the verdict, and the explanation usually contains the fault in plain sight.

Keep a short record of causes rather than scores. Three columns are enough: the date, the question type, and the reason in four or five words. After a month the record starts repeating itself, and the repeats are your syllabus. This is unglamorous, takes about two minutes an evening, and is the closest thing to a shortcut in this entire guide.

The mistakes that cost the most

These are not the obvious ones. Every family already knows not to leave it until the last minute. The expensive mistakes are the ones that look like good preparation while they are happening.

  • 1Papers used as a substitute for teachingA practice paper measures; it does not teach. A child who sits paper after paper on a topic they were never taught simply produces a long record of the same gap. Papers are a diagnostic tool with a teaching step attached, and the teaching step is the part that is usually skipped because it is the part that takes an adult's time.
  • 2Marking without diagnosisCovered above, and worth repeating because it is the most common of all. A score with no cause attached cannot change anything next week.
  • 3Timing added before accuracySpeed is trained last. A child rushed too early becomes fast at their own mistakes, and the resulting habit is one of the hardest things to undo in the final term.
  • 4Buying by the named-question-type listBooks and courses advertise the number of formats they cover, and families choose the longest list. Coverage is not the constraint; whether a child can recognise a type when it appears out of context is. A programme that mixes types well beats one that lists more of them.
  • 5Reading a mock result as a predictionA mock is one morning, with one set of passages, one child's night of sleep behind it. Treating it as a forecast produces either false confidence or unnecessary despair, and both change parental behaviour for the worse for about a fortnight.
  • 6Answer-sheet transcription errorsWhere a separate answer sheet is used, a child who slips a row can lose a long run of marks while getting the questions right. It is entirely preventable with a few rehearsals, and it is almost never rehearsed because it is not really a topic. The habit worth building is a checkpoint: every time your child turns a page, glance at the number on the sheet and the number on the paper.
  • 7Silent vocabulary ceilingsTwo subjects stop improving, the technique looks fine, and nobody thinks to check whether the child knew the words. Months can pass like this.
  • 8The parent becoming the fourth teacher of the dayA child who has been taught since nine in the morning does not have a great deal left at half past five, and a parent switching from parent to teacher at the kitchen table is asking both of them to do something difficult at the worst hour. Where the parent's role is protecting the slot and reading the outcome, families last the distance. Where the parent is also the one delivering four subjects, most plans collapse somewhere in the spring, and the collapse is usually read as a problem with the child.

Tutor, programme, or do it yourself?

An honest account of what a good tutor supplies: structure, marking, an outside eye, and a decision each week about what to do next. That is the whole list, and none of the four items requires a tutor specifically.

It is worth being clear about what makes tuition expensive, which is not the hour itself but the number of hours across two years. A weekly session through Year 5 and into Year 6 is a substantial commitment for most households, and the return depends heavily on whether the six days between sessions contain any work. A tutor who sets nothing between visits is being paid to mark. The published rates and annual totals are gathered on what tuition actually costs a year, and finding a tutor in the West Midlands covers what to ask before you book.

A tutor is genuinely the better answer in two situations. The first is where a child needs a relationship with a particular adult to stay motivated, which is a real and legitimate need. The second is where something specific needs diagnosing in person, such as a child whose reading is fine aloud but falls apart on paper.

Doing it yourself is entirely possible and costs almost nothing except your time and the books, but be honest about which of the four items you can supply every week for two years. Marking is usually the one that goes first. We have written this up properly in preparing for the 11 plus without a tutor, and there is a cost-by-cost comparison in tutor or online course. If you want to see what real material looks like before deciding anything, our free 11 plus practice papers are there to download.

Why does the advice change from one area to another?

Almost everything in this guide holds wherever you live, because reading, number fluency, spaced practice and honest marking are not regional. What does change, and changes enough to alter your weekly plan, is the format of the test itself.

Three things vary. The first is which areas appear: some tests use all four, others use fewer. The second is the weighting, and this is the one families most often miss. If English and verbal reasoning together carry half the result in your area, then a plan that spends most of its energy on shape puzzles is misallocated no matter how diligently it is followed. The third is the mechanics: multiple choice or written answers, one paper or two, answers in the booklet or on a separate sheet.

Work out those three things before you build the timetable, from the admissions authority's own published arrangements. Then let the weighting decide how the week is divided rather than letting your child's least favourite subject decide it.

Our own home ground is the West Midlands, where a group of grammar schools across Birmingham, Shropshire, Walsall, Wolverhampton and Warwickshire share a single entrance test, so a child sits it once for all of them. If that is your area, the West Midlands 11 plus entrance test sets out the papers, the weighting and the registration window in detail. If it is not, the timeline and the subject strategy above still apply; only the mix changes.

That shared test is set by GL Assessment, the assessment publisher the partnership uses rather than writing a paper of its own. Knowing who publishes the paper is more useful than it sounds, because format follows the publisher: the question types, the layout of the answer sheet and the rhythm of a timed section stay consistent across the areas that use the same one. It turns a vague question about whether practice material is any good into a precise one about whether it matches the format your child will actually sit, which is the difference between the right content in the wrong shape and practice that rehearses the real thing.

Pathway Eleven is an independent service and is not affiliated with or endorsed by GL Assessment.

Wellbeing, and knowing when to stop

Preparation that damages a child is not preparation, and it is worth agreeing in advance what would make you stop.

The signals of overload are behavioural before they are academic. Accuracy dropping on work that was previously secure is a common early one, and it is frequently misread as needing more practice, which makes it worse. Avoidance and stalling before sessions, tears at the end rather than the beginning, changes in sleep or appetite, and stomach aches that arrive with the practice book are the others. None of these means a child cannot cope with the 11 plus. They mean the current volume is wrong.

The response is to cut the volume and keep the routine, in that order. Stopping altogether turns a heavy fortnight into a restart from nothing, which is harder on everybody, whereas halving the session for two weeks usually resolves it without anyone having to make a decision about the whole plan.

There is also a quieter risk worth naming. Children absorb how much a parent is invested, and they will work hard to avoid disappointing you long past the point where they are enjoying any of it. If your child has stopped asking how they did, that is often not indifference. It is protection. Our page on 11 plus exam stress goes through what worry looks like at this age and what actually helps.

What is the parent's job, exactly?

The role that works is narrower than most parents assume, and the narrowness is what makes it sustainable across two years.

Protect the slot. The same time on the same days removes a nightly negotiation that nobody wins, and it converts the work from a decision into a habit. Notice the effort rather than the score, because the score is largely outside your child's control on any given evening and the effort is not. Read whatever record you keep, weekly rather than daily, and act on patterns rather than on individual bad sessions.

Plan the days off in advance. A routine with scheduled breaks is a routine; a routine that only breaks when somebody is too tired to argue is a source of guilt for everyone involved. Expect interruptions, because illness, clubs, school trips and flat weeks are normal, and the recovery move is to restart at the usual length rather than to make up the missed time.

And keep the teaching load off yourself where you can. This is not a counsel of laziness. A parent who is also the fourth teacher of the day is doing the hardest job in the house at the worst hour, and it is the reason most family-run plans fail in the spring rather than in September. If something else can carry the sequencing and the marking, your attention is better spent on the two things nothing else can do, which are protecting the slot and keeping the relationship intact.

What does progress actually look like?

Progress in the 11 plus is rarely a rising line of scores. Scores move slowly and jump around, particularly while the difficulty of the practice is also rising, and a family watching the weekly percentage will conclude that nothing is happening for months at a time.

The earlier signals are behavioural. Fewer careless errors on question types your child has met before. Faster starts on familiar formats, because recognition has become automatic. A willingness to attempt an unfamiliar question rather than skipping it. And the clearest one of all: the ability to explain a method rather than only produce an answer. A child who can explain it will still be able to do it in three weeks, and a child who cannot will not.

Watch the shape of the errors rather than the count. Errors moving from method to arithmetic is progress. Errors moving from all over the paper to the final quarter is a pacing problem, which is a different and easier fix. Errors clustering in one question type is a syllabus item. None of that is visible in a percentage, which is why the percentage is the least useful number you have.

app.pathwayeleven.co.uk
Pathway Eleven parent progress report comparing English at 74 per cent and Verbal Reasoning at 75 per cent over the last 28 days, with weekly accuracy bar charts, average pace and a recommended next action.
The parent report answers one question, subject by subject and week by week: is your child moving forward?

Where Pathway Eleven fits

Everything above works without us. If you have the time to sequence the work, mark it properly and decide each week what comes next, you do not need a programme, and we would rather say so than pretend otherwise.

Pathway Eleven is an online 11 plus preparation service that gives each child a personalised daily plan of revision, guided teaching, timed practice and full mock papers, with every question reviewed and approved by a qualified teacher. In practice that means a Starting Assessment to find the level, daily revision that keeps all four areas moving while giving more attention to the weaker skills, Guided Practice that teaches without a countdown, Timed Drills for pace, full mock papers sat under real timings and returned as a report, and a PIN-protected parent area that keeps every completed session for you to read.

It runs from Year 3 through to the test rather than starting in Year 5, which is why the early years in this guide are not a separate product. The full plan covers everything, with no per-subject upgrade and no long contract. Free account. Free Starting Assessment. Unlock the full plan when you are ready.

Sources

The claims about admissions, appeals and study technique on this page come from the following, all checked on 24 August 2026.

  • Department for Education, School Admissions Code, statutory guidance schools must follow when carrying out admissions duties, applying from 1 September 2021.
  • Department for Education, School Admission Appeals Code, statutory guidance on organising and running admission appeals, in force from 1 October 2022.
  • Department for Education, Admission appeals in England, official statistics published August 2026, covering the 2025/26 academic year.
  • GOV.UK, Schools admissions: how places are offered, on the criteria schools use to decide places.
  • Dunlosky, J., Rawson, K. A., Marsh, E. J., Nathan, M. J., and Willingham, D. T. (2013), Improving Students' Learning With Effective Learning Techniques, Psychological Science in the Public Interest.

Where this guide describes registration windows, weightings or paper formats in general terms, that is deliberate. Those are set locally and change, and the only reliable version is the one your own admissions authority publishes for the year your child sits.

Common questions about 11 plus preparation

When should my child start preparing for the 11 plus?+

Many families start in Year 3, and that is the easiest way to do it: three years of short, gentle sessions build the same ground that a Year 5 start has to cover in a hurry. A year before the test is the realistic minimum, and a later start is workable if the weekly time goes up rather than the daily session getting longer.

How long should my child practise on a school day?+

Twenty to thirty minutes is enough for most children in Year 5, and ten to fifteen is enough lower down the school. The session should end while your child still has something left, because the last five minutes of a session that has gone on too long teach avoidance rather than reasoning.

Can we prepare without a tutor?+

Yes, and plenty of families do. What a tutor supplies is structure, marking, an outside eye and a weekly decision about what to work on next. If you can cover those four things reliably, either yourself or through a programme that does them for you, a tutor becomes a choice rather than a requirement.

Is verbal reasoning taught in primary school?+

Usually not as a subject in its own right. Schools teach the reading and vocabulary that verbal reasoning draws on, but the puzzle formats themselves are rarely taught, which is why a bright reader can still stare blankly at the first code question they ever meet.

How should we read a mock test result?+

As a description of one morning, not a forecast. The useful part of a mock is the pattern inside it: which section ran out of time, which question types were skipped, whether accuracy fell in the last quarter. A single overall percentage tells you almost nothing you can act on.

What if my child is much weaker in one subject?+

Give the weaker subject the larger share of the week without dropping the others, because a skill left alone for a few months quietly fades. Rebalance rather than replace, and check the weighting used in your area first, since the subject that feels weakest is not always the one carrying the most marks.

Should we keep going through the school holidays?+

A short session on most days, with clearly marked days off, costs less than a complete stop followed by a restart from nothing. Six weeks of silence in the summer before Year 6 is the most expensive break in the whole calendar, and it is also the least necessary.

What is worth doing in the last two weeks?+

Familiar work at a comfortable level, one timed section every few days, and sleep. New content introduced this late tends to displace something already secure, and a child who arrives tired loses more marks to lapses in attention than they would ever have gained from another late topic.

Where to go next

  • What is the 11 plus?, the test explained from scratch, including how standardised scores work.
  • The 11 plus grammar school test, how selective state schools admit at eleven and why the paper differs from one area to the next.
  • 11 plus preparation in Year 3, the honest short list of what is worth doing this early.
  • 11 plus preparation in Year 4, what belongs in the foundation year and what does not.
  • 11 plus preparation in Year 5, a term-by-term plan for the decisive year.
  • Online 11 plus mock tests, what a mock is for and how to read a result without panic.
  • Free 11 plus practice papers, printable papers to download, with the marking notes that make them useful.
  • 11 plus tutor or online course?, what each one really buys, and what a year of tuition costs.
  • 11 plus tuition near me, the kinds of local provider a search brings back, and the checks to make before booking.
  • Preparing for the 11 plus without a tutor, what you have to supply yourself, and where families come unstuck.
  • 11 plus English comprehension, the question types and the technique that lifts marks fastest.
  • 11 plus verbal reasoning question types, every format a child meets, with the method for each.
  • 11 plus maths topics, a checklist of what has to be secure before the test.
  • 11 plus non-verbal reasoning explained, the shape puzzles that school does not normally teach.
  • 11 plus exam stress, what worry looks like in a ten-year-old and what actually helps.
  • 11 plus glossary, plain definitions for the terms that appear in official letters.
  • The West Midlands 11 plus entrance test, how one shared test can cover a group of grammar schools, the schools that use it, and the registration window that catches families out.
  • The subject hubs: 11 plus maths, 11 plus English and 11 plus vocabulary, each with the format, the weighting and what to practise.
  • The short answers: is my child on track, how much practice a day, is there any creative writing, what is a good score and can you retake it.
  • The comparisons, each figure sourced and dated: Pathway Eleven or a tutor, or Bond 11 plus books, or Atom Learning.
  • What Pathway Eleven costs, one plan, one price, everything included.
  • The Year 5 term planner, term by term, what to cover and when.
  • Pathway Eleven for primary schools, a free 11 plus guide a school can hand to its parents.
Get started Give every study session a clear purpose.

A Starting Assessment, a daily plan that responds to your child's answers, and progress you can actually read.

Create a free account →
Weekly revision planner in Pathway Eleven where a parent sets each day's activity, start time and study goal, with Monday to Friday on revision, Saturday reserved for a full mock and Sunday a rest day.
Pathway Eleven11+ preparation

Personalised 11 plus preparation for children, with clear progress and practical guidance for parents.

Parent sign in →

Guides

All 11 plus guidesFree practice papers11 plus preparation guideWhat is the 11 plus?Grammar school test11 plus preparation in Year 311 plus preparation in Year 411 plus preparation in Year 5Online 11 plus mock testsTutor or online course?Preparing without a tutor11 plus exam stressWest Midlands 11 plusWest Midlands 11 plus datesBirmingham 11 plus scoresIs my child on track?How much practice a day?Is there creative writing?What is a good score?Can you retake the 11 plus?

Subjects

11 plus maths11 plus English11 plus vocabularyVerbal reasoningNon-verbal reasoningMaths topicsEnglish comprehension11 plus glossary

Company

HomeAbout Pathway ElevenFree accountQuestionsContact usFor primary schoolsPathway Eleven or a tutor?Pathway Eleven or Bond?Pathway Eleven or Atom?

Legal

Privacy NoticeTerms of UseSafeguarding
© 2026 Pathway ElevenPrivate family accounts · No child email required · Contact us